Purchase Orders That Recorded Every Cost at Source for a Shopfitter – Alan’s Story

Introduction

Cut costs · Increased efficiency · Saved time — every cost recorded at source & duplications eliminated, overcharges caught before payment

Alan (not his real name) is the purchasing manager at a busy shopfitting company. Every week he and the contracts managers place hundreds of purchase orders: sheet materials and ironmongery for the workshop, lighting and flooring for site, plant hire, and subcontractors for joinery, electrics and decorating.

The orders were going out, but the accounts were always catching up. Costs only reached the right job when the invoice finally arrived, sometimes weeks later. At month end, nobody could say with confidence what had been delivered or done but not yet invoiced. Josef, the company’s Virtual Finance Director (VFD), sat down with Alan to fix the problem where it started: the purchase order.

If you run a manufacturing business, the same approach works there too. See how it helped Russell’s factory lift its gross margin from 34% to 38%.

Situation

  • Many live jobs, each with its own materials, plant and subcontractors.
  • Purchase orders raised by phone, email or a paper pad, with order numbers that ran in sequence and meant nothing on their own.
  • Invoices coded when they arrived, often by guessing which job or overhead they belonged to.
  • Month-end accruals built from manual systems in accounts, memory and phone calls to Contracts Managers.
  • Prices varied from one Contracts Manager to another. When Contracts Managers placed orders in reaction to what was needed on site, they didn’t get the best price. The proof was the difference between the prices one Contracts Manager paid and another paid for the same items.
  • Purchase orders occasionally duplicated. When the Contracts Manager on a job changed, orders were sometimes placed twice.

Obstacles

  • Costs recorded too late. A cost only appeared in a job once the invoice was posted, so job reports always looked better than reality.
  • Wrong job, wrong code. Without a link from the purchase order to the job, costs were misposted between jobs, or between jobs and overheads.
  • No proof of delivery or work done. Deliveries to site and subcontractor work were rarely confirmed against the order, so short deliveries and price differences were found late, if at all.
  • Accruals were guesswork. Without knowing what had been received but not invoiced, the monthly numbers swung up and down.

Action

✔ Order numbers built around the job. Each purchase order number had the job number as a suffix, so 2417-0015 was order 2417, for job 0015. The order numbers themselves ran in sequence, which made it easy to search for and spot any orders still waiting to be fulfilled. The cost was recorded in the job the moment the order was raised.

✔ Non-job purchases coded at source too. Orders for overheads, such as tools, vehicles, workshop consumables and office costs, carried the correct nominal code, so they went straight to the right line in the accounts.

✔ No order, no payment. Josef and Alan agreed the purchasing policy before changing the system. Every purchase order needed a PO number, an agreed price and approval within set limits. The accounts system would not pay any invoice unless it was matched to an order, or orders, and every supplier was told they would not be paid unless their invoice quoted an order number.

✔ Goods received and work done recorded against the order. Site teams and the workshop confirmed deliveries against the purchase order, and contracts managers signed off the value of subcontractor work done.

✔ Three-way matching. Each supplier’s or subcontractor’s invoice was matched to the purchase order and to the goods received or work done. Because the invoice had to match the purchase order value directly, any difference was spotted straight away and went back to Alan to resolve before it was paid.

✔ Exceptions reported to the MD. Any invoice without an order number was flagged up, investigated and reported to the Managing Director.

✔ Accruals straight from the system. Anything received or done but not yet invoiced showed up on an accruals report, by job and by nominal code, ready for the monthly numbers.

Result

✅ Every cost in the right place from day one, in the right job or against the right nominal code.

✅ Accurate accruals every month. The system showed exactly what should be accrued, so there was no more chasing site for paperwork or guessing.

✅ Committed costs visible early. Contracts managers could see what had been ordered against each job’s budget long before the invoices arrived.

✅ Overcharges caught before payment. Price and quantity differences were spotted at the matching stage, not after the money had gone.

✅ More variations invoiced. Investigating why an invoice didn’t match its order often uncovered extra work done on site at the client’s request, so the company could invoice the client for variations that might otherwise have been missed.

✅ Tighter cost control. Unauthorised purchases were weeded out, because nothing could be bought, or paid for, without an approved purchase order.

✅ A faster, calmer month end, with job costs the board could trust. This became the foundation for job-by-job profit reporting and work in progress reporting.

Conclusion

Buying well is about more than getting a good price. By building the job number or nominal code into every purchase order, each cost was recorded where it started, by the person who knew what it was for.

Matching each order to the goods received or work done, and then to the supplier’s or subcontractor’s invoice, meant the accounts no longer had to guess. The system knew what had been delivered, what had been done, and what was still to be invoiced, so the accruals for the monthly numbers came straight from it. And because no invoice was paid without a matching order, spending stayed under control.

For Alan, purchasing became a control rather than a chore. For the board, the job figures finally reflected what was really happening on site.

In Russell’s factory, the buyers did exactly the same, coding every purchase order to its product line.